top of page

East-West Connector
TRAFFIC ADVISORY
There are no traffic advisories to report for this project at this time.
STATUS
EWC-28010 – Active Design
SUMMARY
New construction of the East-West Connector Turnpike (approximately 3.5 miles) between the S. Peebly Road Interchange and the Kickapoo Turnpike/I-40 Interchange. This project will connect the mainline East-West Connector Turnpike with the southern terminus of the Kickapoo Turnpike with a multi-level interchange. Additionally, this turnpike project will bridge over SE 104th Street and SE 89th Street.
TRAFFIC IMPACT
Traffic impact summary will be provided here when available.
MEDIA
Content will be continuously provided as project progresses.
QUESTIONS & COMMENTS
SHARE
OTHER PROJECTS
STATUS:
EWC-28003 – Active Design
STATUS:
EWC-28005 – Active Design
STATUS:
EWC-28002 – Active Design
STATUS:
EWC-28006 – None
bottom of page