top of page

East-West Connector

AlertOff.gif

TRAFFIC ADVISORY

AlertOff.gif

There are no traffic advisories to report for this project at this time.

STATUS

EWC-28010 – Active Design

SUMMARY

New construction of the East-West Connector Turnpike (approximately 3.5 miles) between the S. Peebly Road Interchange and the Kickapoo Turnpike/I-40 Interchange. This project will connect the mainline East-West Connector Turnpike with the southern terminus of the Kickapoo Turnpike with a multi-level interchange. Additionally, this turnpike project will bridge over SE 104th Street and SE 89th Street.


TRAFFIC IMPACT

Traffic impact summary will be provided here when available.

MEDIA

Content will be continuously provided as project progresses.

bottom of page